click to enable zoom
Loading Maps
We didn't find any results
open map
View Roadmap Satellite Hybrid Terrain My Location Fullscreen Prev Next
We found 0 results. Do you want to load the results now ?
Advanced Search
we found 0 results
Your search results

Sale – Building brick factory

Italia

add to favorites 
Ad Id : 25995
Referent: Owner / Holder
Available From: 2020-01-08
Payment Method:
To be agreed

Description

Features and dismantling information

The plant is located near Rome,
The entire plant can be dismantled in two or three weeks, about 20 trucks should transport the machines,
Can be settled in 4/6 weeks.

The production capacity is 1200/1500 tonnes per month.

All the main processing machines are equipped with remote assistance
The area occupied by the plant is about 1500 square meters covered and includes the following departments:

Grinding
Training and loading
Drying and cooking
Download
if you interested eand need more information contac me
[email protected]
in attach other information in pdf file

Documents

Do you know someone who might be interested?
Share this ad!